Environmental Impact Assessment, Strategic Environmental Assessment, Pre-Assessment and Evaluation
Alkranel LCC has made different environmental impact assessments, strategic impact assessments, pre-assessments and evaluations and given advice in that field since 2003. We have necessary licenses and we are trained to evaluate different environmental impacts (included Natura 2000). Most of our projects are listed in Estonian rubric (follow the link).
Excerpts from activities (194)
-
Client: World7 OÜ
Detailed plan of Allika – Strategic Environmental Assessment
-
Client: Roadplan OÜ
Reconstruction of road – Environmental Impact Assessment
-
Client: Fausto Capital OÜ
Strategic Environmental Assessment of high-rise building
-
Client: Paju Arendus OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Tallinna Keskkonna- ja Kommunaalamet
Pre-Assessment of Environmental Impact – detailed plan
-
Summary of 2022
In 2022, the Alkranel OÜ team advised over 100 different projects.
-
Client: Roadplan OÜ
Reconstruction of road – Environmental Impact Assessment
-
Client: Kivikandur OÜ
Environmental Impact Assessment of Kobra quarry
-
Client: Selektor Projekt OÜ
Reconstruction of road – Environmental Impact Assessment
-
Client: Eesti Energia AS
Solar power plant development consultancy
-
Client: Teesiht OÜ
Conducting input research for Environmental Permit
-
Client: Aigren OÜ
Conducting input research for Environmental Permit
-
Client: Parem Puhastus OÜ
Land use analysis in a green network
-
Client: Stricto Project OÜ
Reconstruction of bridge – pre-assessment
-
Client: Tuulekaru OÜ
Reconstruction of road – pre-assessment
-
Client: Kiirkandur AS
Environmental Impact Assessment of Kaopalu III quarry
-
Client: Selektor Projekt OÜ
Reconstruction of the waste station – pre-assessment
-
Client: Eesti Killustik OÜ
Environmental Impact Assessment of Potsepa quarry
-
Client: Ralfi Veosed OÜ
Pre-Assessment of industry
-
Client: Järve Biopuhastus OÜ
Environmental Impact Assessment – Water Use Permit Application
Project suspended and terminated.
-
Client: Elva Vallavalitsus
Beach area detail planning and Strategic Environmental Assessment
-
Client: Roadplan OÜ
Reconstruction of road – pre-assessment
-
Client: Saka Mõis OÜ
Pre-Assessment of solar power plant
-
Client: Tartu Arhidektuuribüroo OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Viira Vesiveski OÜ
Pre-Assessment of hydroelectric power station
-
Client: Mustvee Vallavalitsus
Mapping of rainwater, land improvement and flood issues
-
Client: Kristo Kasepalu
Pre-Assessment of Environmental Impact – detailed plan of residential
-
Client: Disaintekstiil OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Toila Vallavalitsus
Pre-Assessment of solar power plant
-
Client: Luunja Vallavalitsus
Detailed plan of Tarmeko Ltd production area – Strategic Environmental Assessment
-
Client: Forest Haldus OÜ
SEA of golf course detailed plan
-
Client: AB Artes Terrae OÜ
Pre-Assessment of Environmental Impact – detailed plan of welfare institution
-
Client: Adrdordan OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Toner-Projekt OÜ
Pre-Assessment of Environmental Impact – road project
-
Client: Luunja Vallavalitsus
Strategic Environmental Assessment – preparation of documentation (VTK)
-
Client: Meander Kinnisvara OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Elva Vallavalitsus
Inventory of vegetation
-
Client: Toomas Kaur
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Asset OÜ
Pre-Assessment of Environmental Impact – detailed plan of private residences
-
Client: Põltsamaa Varahalduse OÜ
Pre-Assessment of Environmental Impact – development of water management systems
-
Client: Tartu Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of private residences
-
Client: Kivilõppe Puhkekeskus MTÜ
Pre-Assessment of Environmental Impact – development of resting place
-
Pre-Assessment of Environmental Impact – detailed plan of private residence
-
Client: X-building OÜ
Pre-Assessment of Environmental Impact – detailed plan of private residences
-
Client: Dikapro OÜ
Discovering Land Use Restrictions Prior to Planning
-
Client: Nikamol OÜ
Strategic Environmental Assessment – Rööpa IA, Maardu
-
Client: Devalko OÜ
Pre-Assessment of Environmental Impact – detailed plan of private residences
-
Client: Dikapro OÜ
Inventory of vegetation and Aves
-
Client: Riigimetsa Majandamise Keskus
Detailed plan of bridges – Strategic Environmental Assessments
-
Design application of private residence
-
Client: Vudila Mängumaa OÜ
Pre-Assessment of Environmental Impact – development of resting place
-
Client: Lääne-Nigula Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of private residence
-
Client: Kaltsiumkarbonaat OÜ
Limestone mineral deposit – coordination of environmental investigations
-
Client: Inseneribüroo Urmas Nugin OÜ
Pre-Assessment of the fish passage conceptual design for Undla
-
Client: Morrison Invest AS
Discovering Land Use Restrictions Prior to Planning
-
Client: Kivikandur OÜ
Noise Modelling of Tarva quarry and Implementation of Natura data form
-
Client: Tarmeko KV OÜ
Reorganization of Tarmeko manufacture – study
-
Client: Kiikri Ehitus OÜ
Evaluation of pollution risk
-
Client: Rõuge Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of resting place
-
Client: Riigimetsa Majandamise Keskus
Pre-Assessment of Environmental Impact – detail design of Rumbi bridge
-
Client: Jõgeva Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of church
-
Client: Haljala Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of harbor
-
Surroundings analysis – campsite
-
Client: Estover OÜ
Surroundings analysis – Paneeli 2a st
-
Inventory of vegetation
-
Client: Eesti Roheline Liikumine MTÜ
Evaluation of Ülemiste lake and its sanitary territory
-
Client: Tähtvere Vallavalitsus
SEA of Vorbusemäe resting place detailed plan
-
Client: Rae Vallavalitsus
School of Järveküla – evaluation of noise
-
Discovering Land Use Restrictions Prior to Planning
-
Client: KART Performance Trailers OÜ
Pre-Assessment of Environmental Impact – development of industrial building
-
Client: Alajõe Vallavalitsus
SEA of Paadisadama real estate detailed plan
-
Client: Lapavira OÜ
SEA of Rutikvere detailed plan – fish farm
-
Client: Piiber Projekt OÜ
Pre-Assessment of the fish passage conceptual design for Tille dam
-
Client: Puhja Valla Arendus SA
Pre-Assessment of Environmental Impact – detailed plan of industrial area
-
Client: TT Lontova OÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Tartu Linnavalitsus
Tartu – consultation of planning the river and other waters shores
-
Client: Europolis OÜ
Pre-Assessment of Tapa pipeline project
-
Client: Eesti Ühistuenergia OÜ
Windmill project – expertise
-
Client: AÜ Suvesaar MTÜ
Pre-Assessment of Environmental Impact – detailed plan
-
Real estate of Aasa – mapping land usage restrictions
-
Client: Varbla Puhkeküla AS
Noise and Dust Modelling of Ännikse quarry
-
Client: FAMA Invest OÜ
SEA of A. Puškini 23a detailed plan
-
Client: Leevi HPP OÜ
EIA of Leevi hydroelectric power station reconstruction
-
Client: Piiber Projekt OÜ
Pre-Assessment of the fish passage conceptual design for Aarike II dam
-
Client: Tartu Linnavalitsus
Tartu – consultation of planning the river bank
-
Client: Illuka Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Inseneribüroo Urmas Nugin OÜ
Pre-Assessment of the fish passage conceptual design for Venevere dam
-
Client: Tera Parkett OÜ
SEA of Süsineeme detailed plan
-
Client: Tiigi Keskus AS
Pre-Assessment of Environmental Impact – detailed plan
-
Client: Inseneribüroo Urmas Nugin OÜ
SEA of Pihkva tn 48a ja 48b detailed plan
-
Client: Maanteeamet
Pre-Assessment of Environmental Impact – technical project of road Tallinn-Tartu-Võru-Luhamaa – 198 – 201 km
-
Client: Anne Strati Arhitektuuribüroo OÜ
Coordination of health risk analysis
-
Client: Soojusekspert OÜ
Assessment of Valduri real estate detailed plan
-
Client: VMT Ehitus AS
SEA of cowhouse detailed plan
-
Client: Priit Tammeorg
EIA of reservoir reconstruction
-
Client: Sõmeru Vallavalitsus
Pre-Assessment of Environmental Impact – detailed plan of motor-cycle races area
-
Client: Viru Rand OÜ
Pre-Assessment of Environmental Impact – production facility of Viru Rand
-
Client: Väo Paas OÜ
Updating EIA of Ruu limestone quarry
-
Client: Lääne Vara OÜ
Detailed plan of Reimani recreation area
-
Client: Projektbüroo Koda OÜ
Pre-Assessment of Environmental Impact – conceptual design for Ordulinnus dam
-
Client: Turvas AS
Implementation of Natura data form
-
Client: Tähtvere Vallavalitsus
Pre-Assessment of Environmental Impact – Vorbusemäe resting place
-
Client: Erksaar OÜ
Environmental Impact Assessment of Rummu mineral deposit – Rummu
-
Client: EA Reng AS
Pre-Assessment of Environmental Impact – Mustvee water management
-
Client: Peipsi Kalamees AS
Strategic Environmental Assessment of Kolkja resting site detailed plan
-
Client: Eesti Geoloogiakeskus OÜ
Noise and Dust Modelling of Pombre quarry
-
Client: Eesti Geoloogiakeskus OÜ
Noise and Dust Modelling of Helmi-Aakre mineral deposit
-
Client: Tarvastu Vallavalitsus
Detailed plan and SEA of Tarvastu resting place
-
Client: Toner-Projekt OÜ
Pre-Assessment of Environmental Impact – conceptual design of road Tallinn-Tartu-Võru-Luhamaa – 197 – 201 km
-
Client: Freda OÜ
Discovering Land Use Restrictions Prior to Planning
-
Client: Piiber Projekt OÜ
Pre-Assessment of the fish passage conceptual design for Pajuveski dam
-
Client: Saku Vallavalitsus
Environmental Impact Assessment of Kurtna artificial lake
-
Client: Tusti Külaselts MTÜ
Environmental Impact Assessment of Tusti dam
-
Client: Generaator AS
Strategic Environmental Assessment of Saesaare water-power station detailed plan
-
Client: Kallaste Linnavalitsus
Assay – needfulness of SEA
-
Client: Forest Haldus OÜ
Pre-Assessment of Environmental Impact – golf course
-
Client: Inseneribüroo Urmas Nugin OÜ
Evaluation – reconstruction of artificial lake
-
Client: Kivilõppe Puhkekeskus MTÜ
EIA of Kiviräbi and Uue-Räbi real estates – boat canal and swimming place
-
Client: RevalGate Holding OÜ
SEA of hippodrome
-
Client: Marko Milius
Ranna pst 36 Strategic Environmental Assessment
-
Client: Generaator AS
Evaluation – reservoir of Leevaku
-
Client: Generaator AS
Environmental Impact Assessment of Kunda water-power station
-
Client: Artstyle OÜ
Pre-Assessment of Environmental Impact – Liivaaugu ja Männimetsa
-
Client: Rain Tobreluts
Environmental Impact Assessment of Viira dam
-
Client: Lentsetti AS
Pre-Assessment of Environmental Impact – Männituka ja Kivinurme
-
Client: Balti Spoon OÜ
Pre-Assessment of Environmental Impact – Kupu – industrial estate
-
Client: Lõuna-Eesti Karjäärid OÜ
Environmental Impact Assessment of Kobratu mineral deposit – Kobratu IV
-
Client: Antsla Vallavalitsus
Master plan of Antsla parish and strategic environmental assessment of the master plan
-
Client: Tähtvere Vallavalitsus
Strategic Environmental Assessment of Kardla village Liisu, Sirli, Andre, Näki tee, Allikavärava ning Simmu real estate detailed plan
-
Client: Kehala MTÜ
Pre-Assessment of Environmental Impact – Päide
-
Client: K&H AS
Strategic environmental assessment of the Järva, Jõgeva and Tartu county development plan “Highway E263”
-
Client: Inseneribüroo Urmas Nugin OÜ
Strategic Environmental Assessment of Kallaste dock detailed plan
-
Client: MikuHansu OÜ
Pre-Assessment of Environmental Impact – Valli
-
Client: Escado Grupp OÜ
Pre-Assessment of Environmental Impact – Kiige – industrial estate
-
Client: Kiviõli keemiatööstuse OÜ
Expertise for estimation of construction restriction
-
Client: IS Systems OÜ
Pre-Assessment of Environmental Impact – Laabi 2 – industrial estate
-
Client: Real Kinnisvara OÜ
Pre-Assessment of Environmental Impact – Hindreku 1 – industrial estate
-
Client: Räpina Paberivabrik AS
Pre-Assessment of Environmental Impact – industrial estate
-
Client: Tehnonord OÜ
Pre-Assessment of Environmental Impact – plant for granulate mineral fertilizer
-
Client: Nikamol OÜ
Ambient Air Pollution modelling of Rööpa IA (44603:002:0126) real estate
-
Client: TREF AS
Environmental Impact Assessment of Kukemetsa mineral deposit – Kukemetsa and Kukemetsa IV
-
Client: Tera Parkett OÜ
Pre-Assessment of Süsineeme detail planning
-
Client: Saku Vallavalitsus
Environmental Impact Assessment – reconstruction of Saku dam
-
Client: Toetuskeskus Meiela MTÜ
Pre-Assessment of Kodu real estate detail planning
-
Client: Albert Rakaselg
Pre-Assessment of Põrgukesa detail planning
-
Client: Suuremäe Karjäär OÜ
Enviromental judgment of Paluküla II sand pit
-
Client: Raju AS
Expertise of Sindi dam
-
Client: Maru Ehitus AS
Pre-Assessment of Härmapõllu ja Vanaoja detail planning
-
Client: Metsatervenduse OÜ
Enviromental judgment of Kiruvere sand pit
-
Client: Taavo Toomsalu
Evaluation of Toomu real estate for building
-
Client: Eesti Energia kaevandused AS
Environmental Impact Assessment of Lõuna-Ahtme oil shale mine
-
Client: Illuka Vallavalitsus
Consultation – Illuka parish
-
Client: Andy Viljandi OÜ
Noise and Air Pollution Modelling and vibration measuring – Tehnika tn 91
-
Client: Karimek OÜ
Pre-Assessment of Environmental Impact – Karimek LCC
-
Client: GPP OÜ
SEA of Kiviräbi and Uue-Räbi detailed plan
-
Client: Õnneratas OÜ
Evaluation of Detail Planning
-
Client: Tartu Keskkatlamaja AS
Pre-Assessment of Environmental Impact – Tartu Keskkatlamaja Ltd
-
Client: Autostop OÜ
Pre-Assessment of Environmental Impact – Autostop LCC
-
Client: Saku Vallavalitsus
Conceptual design, application and pre-Assessment of the fish passage conceptual design for Saku dam
-
Client: Inseneribüroo Urmas Nugin OÜ
Pre-Assessment of the fish passage conceptual design for Ltd Kunda Nordic Tsement dam
-
Client: Inseneribüroo Urmas Nugin OÜ
Pre-Assessment of the fish passage conceptual design for Linnamäe hydroelectric power station
-
Client: Sangaste Veed OÜ
Pre-Assessment of the fish passage conceptual design for Sangaste dam
-
Client: Paide Vallavalitsus
EIA of Tarbja artificial lake sanitation
-
Client: Kiirkandur AS
Enviromental judgment of Tatramäe gravel pit
-
Client: Tartu Linnavalitsus
Pre-Assessment of environmental impact for Supilinna theme planning
-
Client: Mustajõe Kolm SÜ
Strategic environmental assessment of Mustajõe 3 area architectural drawings
-
Client: Latvera OÜ
Strategic environmental assessment of Lageda ground (51301:013:0023) and control zone architectural drawings
-
Client: Illuka Vallavalitsus
SEA of Illuka parish masterplan
-
Client: Metsatervenduse OÜ
Enviromental judgment of Soomukse II gravel pit
-
Client: Suuremäe Karjäär OÜ
Enviromental judgment of Geological Survey (Kõnnu II)
-
Client: Vaggen AS
Pre-Assessment of environmental impact for detail planning
-
Client: Paikuse Vallavalitsus
Strategic environmental assessment of Reiu guest harbor detailed plan
-
Client: Minnoli OÜ
Pre-Assessment of environmental impact for detailed plan (Tapa waste station)
-
Client: Krüüdneri Karjäär OÜ
Enviromental judgment of Neeruti II gravel pit
-
Client: Set Point OÜ
Noise pollution modelling and expert estimation of architectural drawings (environmental aspects)
-
Client: Est-Paas OÜ
Review of natural resources mine licence application and strike transportation
-
Client: Narva Gate OÜ
Provisional estimate of strategic environmental impact assessment at architectural drawings of Joala st 21, 23a, 23b, 23c and 23d
-
Client: Tallinna Keskkonnaamet
Strategic environmental assessment of the Tallinn Nõmme district masterplan
-
Client: Rakvere Vesi AS
Environmental impact assessment of Rakvere waste water treatment plant and water supply and sewerage systems
-
Client: Rakvere linn
Strategic environmental assessment of the Rakvere town masterplan
-
Client: Emajõe Lodjaselts MTÜ
Environmental Impact Assessment of water individual usage permission by Emajõe Barge Society
-
Client: SW Soojus OÜ
Environmental impact assessment of SW Soojus permit application of railway sleepers incineration
-
Client: Cleanaway AS
Environmental impact assessment of Aardlapalu landfill closure
-
Client: VMT Ehitus AS
Environmental impact assessment of Perevara AS new cattle farm
-
Client: Rae Vallavalitsus
Strategic environmental assessment of the Rae parish masterplan
-
Client: Tartu Linnavalitsuse linnamajanduse osakond
Environmental impact assessment of the construction of the Vabaduse bridge in Tartu
-
Client: Tartu Ülikool
Environmental Impact Assessment of the new Chemistry building of Tartu University
-
Client: Orava Vallavalitsus
Strategic environmental impact assessment of the Piusa Caves Visitor Centre territory detailed plan and of the Visitor Centre
-
Client: Ragn-Sells AS
Environmental impact assessment of the Paldiski landfill closure
-
Client: Tartu Linnavalitsuse linnamajanduse osakond
Environmental impact assessment of the waste station (Jaama 72) of Tartu municipality
-
Client: Ragn-Sells AS
Environmental impact assessment of the Pullapää landfill closure
-
Client: Kehtna Vallavalitsus
Envrionmental impact assessment of the architectural drawings of Paluküla sport centre
-
Client: Kraver AS
Environmental impact assessment of the Soosaare I, Soosaare II, Soosaare III , Soosaare IV peat mining sites
-
Client: Tartu Vallavalitsus
Environmental impact assessment of the recontruction of the habor from the Yacht Club Tartu Kalev and changing the shore of lake Saadjärv